Technical characteristics of the first and second phase of Centerpoint
General Features
- Designed according to LEED, WELL and BREEAM GOLD and ACCESS FOR YOU standards
- Planned seating density: 1 person / 10m2 NLA
- 6 staircases, 4-6 elevators per core
- Medium Voltage Dual Input and Diesel Generator
- Low energy 4-pipe fan coil system, heat recovery, heat utilization, rainwater recovery
- Average 2.65-2.75m clear floor to ceiling height
- Raised floor and electric floor boxes
- 600×600 mm suspended ceiling grid system, built in lighting units, smoke detectors
- Glass surfaces made with clear glazing, with optional internal shading devices; all in line with requirements for energy efficiency
- There will be openable windows on office levels.
- Elegant roof terraces with panoramic view
- In-house conference room
- In-house café / restaurant
- ATM
- 7/24 reception / security service
- CTV network and card access control system
- Building Management System
- Bicycle storage, showers and lockers (LEED)
- High speed Wi-Fi in common areas
- Defibrillator
- Electric Car Charging Stations (LEED)
Underground car park
- 580+429 Parking Spaces (LEED)
- On-site storage
- Minimum height: 2.10m on underground levels
- Lighting: 75 lux
Architectural specification
- Structural loading capacity on general office areas: 3,00 kN/m2
- Efficient column grid and floor plate layouts
- External windows and doors are modern aluminium system
- Main entrance with air curtains
- Modern elevators ensure optimal waiting times
- Tenants use only internal gardens
Mechanicalattributes
- Heating and cooling: a modern HVAC system controlled by BMS
- Ventilation: offices shall receive 45 m3 / h / person
- Acoustic performance (noise) of HVAC system: maximum of 45 dB in office areas and meeting rooms
- Sprinkler system
- Rain water: shall be harvested for irrigation or indoor non potable water applications (LEED)
- Metering of Heating and Cooling: meters are installed to measure the heating and cooling consumption of each office areas (LEED)
- All data are indicative and will need verification on completion.